TimeWeave

Event Schedule Builder

Enter your details, create a plan and review it before sharing with your group.

An open handwritten calendar and schedule planner
Photograph · An open handwritten calendar and schedule planner

Your planning canvas

Your result will appear here. Saved plans are available in My projects.

THE HOST’S FIELD NOTES

Turn a list of activities into a running order you can check.

Put transitions on the clock

Schedules often overrun because the visible activities look reasonable while arrivals, explanations, breaks and cleanup are left outside the calculation. TimeWeave lays out a single consecutive sequence so those omissions become easier to see. It works for a dinner, workshop, game afternoon or any gathering with one shared running order.

It is especially useful when a venue has a firm end time. Begin with the real window available, including any work that must finish before handover. The calculator can add minutes accurately, but it cannot know when a room booking begins or whether a supplier will arrive on time.

Enter one activity per line

Set Start time and Available minutes. In the activities box, write each activity name, a vertical bar and its duration: Welcome | 10. Keep the lines in the order you intend to run them. Durations must be positive whole minutes; a zero-minute break or a negative adjustment is not a supported way to repair the schedule.

Create the first plan, then change an activity duration in the form to recalculate subsequent times. This automatic recalculation is specific to TimeWeave. The tool does not infer a missing break or move a late activity into another room. Add a named buffer yourself whenever it needs to occupy time.

Read the totals before the individual times

The result shows an activity’s start, end and duration, plus total minutes, remaining minutes and a conflict flag. Remaining time is the available limit minus the sum of entered durations. A negative number means the plan exceeds the limit; it is not a recommendation to shorten the final activity automatically.

Crossing midnight is supported and later times receive a Day 2 label. That label is a relative day marker, not a calendar booking. The tool handles one sequence rather than parallel tracks, individual guest timetables or travel-time estimates. If two activities happen simultaneously, coordinate that situation separately instead of entering both as consecutive full-group blocks.

Fictional example: a two-hour making session

A host has 120 minutes from 14:00 for twelve guests. Enter these six lines: Welcome | 10; Demonstration | 15; Making | 45; Break | 10; Sharing | 20; Cleanup | 10. Put each line on its own row in the actual input box.

The resulting sequence is Welcome 14:00–14:10, Demonstration 14:10–14:25, Making 14:25–15:10, Break 15:10–15:20, Sharing 15:20–15:40 and Cleanup 15:40–15:50. Total duration is 110 minutes, leaving ten minutes within the 120-minute window. The conflict flag is false.

The host can leave those ten minutes as unallocated margin or explicitly add Buffer | 10 before cleanup. If Making increases from 45 to 60 while the other lines stay unchanged, the total becomes 125 minutes and the plan ends at 16:05: five minutes beyond the limit. The useful decision is which activity to shorten, not how to conceal the warning.

The fictional 110-minute running order
ActivityStartEndMinutes
Welcome14:0014:1010
Demonstration14:1014:2515
Making14:2515:1045
Break15:1015:2010
Sharing15:2015:4020
Cleanup15:4015:5010

Use the schedule as a working document

Give each segment a real-world owner in your host notes and agree what marks its finish. A “sharing” block without an endpoint can absorb every remaining minute. Preserve rest and essential briefings when revising; reduce optional material first. Test instructions aloud to discover whether a five-minute explanation actually fits.

Save after the timings reflect your chosen plan. A printed host sheet is useful when the event space has unreliable connectivity, but reprint if the schedule changes. TimeWeave does not send reminders, synchronize calendars or monitor the real start of each activity. Use a separate clock and host communication process on the day.

Questions before you begin

Does spare time appear as a scheduled break?

No. Remaining minutes are a total. Add an explicit Break or Buffer line to give those minutes a position in the running order.

Can I enter half minutes?

No. Activity durations must be whole minutes between 1 and 1,440. Round realistically rather than pretending an explanation has exact second-level timing.

Will changing a duration shift later times?

Yes, after the first generated result, form edits recalculate the sequence. Check the status message and save the revised result.

Does a conflict check my venue calendar?

No. It compares entered durations with Available minutes. Confirm room access, cleanup deadlines and outside bookings directly.